Parking Lot Work Complete

The new museum parking lot is complete! 27 regular spaces and 1 handicap space are marked - double our former capacity in a much more accessible layout. Under the new lot city sewer hookups have been completed to the museum and Carter House. The flag pole was moved between the museum and Carter Barn. New landscaping and signage are planned for 2010 to compliment the new work and make the site more cohesive.


Parking Lot September 2010


Parking Lot November 2010



Front Sidewalk September 2010 - The decorative paver bricks, although attractive, were difficult to keep free of weeds during the summer and ice during the winter.



Front Sidewalk November 2010 - A new cement sidewalk and ramp make the entrace safer and cleaner year-round.